No need to say what is before and after! Here is what is ready:
- The towel shelves are built and ready to install
- The floor is ready to be put down (walnut boards are upstairs)
- The tub is ready to be put in (it is sitting in the sunroom ready)
- One mirror is ready to hang (in my wood shop)
- The toilet is ready to install (that is IMPORTANT)
- The vanity is built (not by me) and ready to be installed after which the granite will be cut and installed
- The tub/shower area will be tiled by a professional and that will not be done until maybe in early October
Terry had a fall several days ago and she is dealing with MUCH pain and that needs to be addressed in a big way. Our plan is still for us or me to be in Naples by October 22nd or so.
I am still dealing with fatigue a bit. I would say it is old age but I am not yet 70 so I will say it is still that Lyme thing hanging on. I will see the doctor before we leave.
I forgot to mention that a BIG thing that needs to happen is clean up and then of course we need to get Pete over here to do floors upstairs. That may not happen until 2017 but maybe this fall!
No comments:
Post a Comment